Mezzanine Floors Ipswich

A Day Trip From The Gold Coast

Our team travels to Ipswich as a day trip along the Logan Motorway to build steel mezzanine floors, access stairs and fitouts for warehouses and workshops. Every mezzanine floor is engineer certified and installed by our own team, not a subcontractor.

We're based on the Gold Coast. We can reach Ipswich without going through Brisbane, so it's a day trip, not an overnight stay, and the travel usually adds little to the quote.

Get A Mezzanine Floor Quote

Tell us where it is and roughly how big, and we'll get back to you with a rough price.

Quick Check

Select the music note icon.

Or call 07 2802 4421

Engineer Certified

Every floor comes with engineer certified drawings

Our Own Team

We measure the site and we install it

Gold Coast To Brisbane

Coomera and Yatala through to Logan and Ballina

Why An Ipswich Job Is A Day Trip

Our yard is at the northern end of the Gold Coast, and the Logan Motorway runs west from there without going through Brisbane. That's why an Ipswich job is priced like a Logan job, not like a job on Brisbane's north side.

Building a mezzanine floor comes down to four steps: a site measure, a set of drawings, a steel delivery and the installation. Our team stays on site for the whole installation, so the distance doesn't slow the build down.

You get a team that has been building mezzanine floors for four years and has built more than a hundredof them. If the trip adds a cost, it's shown on the quote, and on most Ipswich jobs it's a small one.

What An Ipswich Warehouse Usually Needs

The buildings we see in Ipswich tend to be newer than in Brisbane. Many are industrial estate sheds built in the last fifteen years, with good ceiling height, a simple steel frame and a slab poured to take a forklift.

That makes them good buildings for a mezzanine. The main thing to plan around is usually how you use the space underneath.

Where The Mezzanine Floor Should Go

A newer building usually has enough headroom, so the question is which part of the floor you can build over. The mezzanine usually goes over the quietest area, which is nearly always the back wall or the side away from the roller door.

Covering Half The Building Is Usually Enough

A mezzanine across the whole building is rarely needed, and it's always the most expensive option. Covering half the building usually gives you the space you need for a lot less.

12m12mfloor over the topracking under it
This is a floor plan of a warehouse with the mezzanine drawn over the top of the racking. The racking underneath keeps working, so you use the area inside the dashed line twice. How far the mezzanine can extend depends on your clear height, not on how much free floor space you have.

Why Load Ratings Differ Between Quotes

A mezzanine rated for light storage and one rated for pallets of stock can look the same from above, but they are built very differently underneath. This is often where one quote comes in cheaper than another, and you don't want to find that out later.

That's why we ask what you plan to store up there before anything is drawn. The engineer sets the load rating to suit, and it's written on the drawings you keep.

1m2m4m7.0 kPa7.0 kPa8.0 kPa
This shows the same deck with three different stack heights, and the load the floor has to be designed for under each. Two of the numbers are the same, because the standard sets a minimum of 7 kilopascals for general storage, however low you stack. Only above about 3.5 metres does the stack height push that number up. For most storage floors, 7 kilopascals is the figure.

Is Your Building Already Up, Or Still Being Designed?

We see plenty of both in Ipswich. The answer affects the cost of a mezzanine more than its size does, so it's worth knowing before you ask for a price.

Either is fine, but planning the mezzanine before the building goes up can save you a lot of money.

The Building Is Already Up

This is our most common type of job.

  • The mezzanine is designed around what is already there: the steel frame, the ceiling height and the roller door
  • Footings are cut into the existing slab where the columns sit, which is normal work
  • Nothing about the building has to change, and your business keeps running while we install it

The Building Is Still Being Designed

Tell us early, because this is when a mezzanine costs the least.

  • Column positions can be set before the slab is poured, so the slab doesn't need to be cut or strengthened later
  • The ceiling height can be raised at the design stage for much less than it would cost to fix later
  • Your builder's engineer and ours can agree on the load rating once, at the start

If the slab hasn't been poured yet, get in touch as soon as you can. Once the slab is poured, changes to it cost a lot more.

Checking The Concrete Slab

A mezzanine puts the weight of a whole floor onto a few columns, and each column sits on your concrete slab. In an industrial estate shed this is usually fine, because the slab was poured to take a loaded forklift.

It's still worth checking. If the slab is too thin for the columns, we cut a concrete pad footing in under each one. This is normal work, and much cheaper than finding a problem later.

What We Look For Before Anything Is Drawn

We check the slab thickness, anything buried in it, and where the joints are. A column shouldn't sit on a joint in the slab, and moving it a metre at the design stage costs nothing.

Ask Your Landlord Early

Cutting a footing into a slab in a leased building is a structural change, and it's much easier to get your landlord's approval before the mezzanine is designed. Waiting on this is the most common thing that holds up a quote.

150300on the slabcut inon a footing
This shows a column base on two kinds of existing slab. On the left, the slab is strong enough, so the base plate sits straight on it and nothing is cut. On the right, the slab can't carry the load on its own, so a concrete pad footing is cut in and poured underneath before the steel goes up.

What An Ipswich Quote Covers

It covers the same things as a Gold Coast quote, with the travel shown as its own line. If a quote you are comparing leaves out any of these, it doesn't cover a finished floor.

  • A site measure in Ipswich, with the layout drawn around your racking and aisles
  • Structural design and engineer certified drawings for your building
  • Steel supply: columns, beams, joists and decking to the loading you tell us about
  • Access stairs, landings and handrail to every exposed edge, built to AS 1657
  • Pallet gates where stock is lifted between levels
  • Installation by our own team, planned around your business
  • Any travel cost shown as its own line on the quote

Mezzanine Floors In Ipswich: Common Questions

These are the questions we get asked most about Ipswich jobs. Click on a question to see the answer.

Do you actually build in Ipswich, or just quote it?

Yes, we build it. Ipswich is within our normal working area, and the same team that installs on the Gold Coast installs there. We don't subcontract the installation. The only difference for an Ipswich job is the drive.

Does an Ipswich job cost more than the same floor on the Gold Coast?

The mezzanine floor itself costs the same. Ipswich is a day trip, not an overnight stay, so on most jobs the travel makes little difference to the price. If there is a travel cost, it's shown as its own line on the quote.

Do you have an Ipswich office?

No. We're based on the Gold Coast and travel to Ipswich along the Logan Motorway. If you need someone who is always fifteen minutes away, we may not be the right fit.

Does an Ipswich job take longer because of the travel?

No. Ipswich is a day trip, so our team goes home each night and the installation runs the same way as a Gold Coast job. The main thing that affects the timeframe is certification: about a fortnight without it, and around six weeks with it.

Does a mezzanine floor in Ipswich need building approval?

Often, yes. The rules are set by Queensland, not by your local council. A small storage platform is sometimes exempt, but the stairs and guardrail usually mean it needs approval. A licensed building certifier makes the final decision.

We can manage the approval for you as a separate item on the quote, or give you the engineer certified drawings to handle it yourself.

Our building is not up yet. Is it too early to talk about a mezzanine?

No, it's the best time. Column positions can be set before the slab is poured, and the ceiling height can be raised at the design stage. Both are cheap to do now and expensive or impossible later. Send us the builder's drawings and we will tell you what to change while it still costs nothing.

Can you build a mezzanine in a leased Ipswich warehouse?

Yes. Check what your lease says about structural work and what happens at the end of the lease. This matters most when the slab needs a footing cut in under each column. That is a structural change, and your landlord has to agree to it before the mezzanine is designed.

Do you cover Ipswich and Brisbane as one trip?

Sometimes, if the timing works, so mention it when you get in touch. We reach Ipswich along the Logan Motorway without going through Brisbane, so the two are often separate trips.

What We Build In Ipswich

We build the same range in Ipswich as we do on the Gold Coast. These three suit industrial estate sheds best.

Approval, certification and the rules for stairs and access are the same in Ipswich as anywhere in Queensland, and the guide to what a mezzanine floor actually is explains them.

Is your job in Brisbane? Read what a mezzanine floor in Brisbane involves, or see every area we build mezzanine floors in, from Coomera through to Ballina. Working out a budget first? Read what drives the cost of a mezzanine floor.

Send Us The Ipswich Address And The Dimensions

Send us the address, the clear span (wall to wall) and what you plan to store upstairs. If the building isn't built yet, send the builder's drawings and we will tell you what to change before the slab is poured.

When We Answer
Monday to Friday, 6am to 4pm
Where We Build
Coomera and Yatala through to Logan and Ballina
What To Have Ready
Your address, the clear span (wall to wall), the height to the lowest thing overhead, and what you plan to store up there.

Get A Mezzanine Floor Quote

Tell us where it is and roughly how big, and we'll get back to you with a rough price.

Or call 07 2802 4421